The Hoover Dam Bypass Bridge

By Ben on Mon Nov 9 2009
The Hoover Dam Bypass Bridge
Gear  |  Projects
The pictures of the Hoover Dam Bypass Bridge are amazing! The photos were shot in September 2009. The entire project is expected to be completed by September 2010. The $240 million, 2,000-foot bridge is part of a larger project, a 3.5-mile corridor that begins in Clark County, Nevada, and ends in Mohave County, Arizona. More construction photos check out here.





Via Gizmodo, DRG industrialinterface
  
#1 Post by c, on Mon Nov 9 2009 10:55 PM
$240 MILLION so that people don't have to drive around the little U-shaped road?!
#2 Post by Keith, on Tue Nov 10 2009 1:3 AM
No, $240 million to keep terrorists from being able to get a truck loaded with explosives down onto the dam and blow it up, wiping out the entire western half of the United States' (and possibly the eastern half as well) power grid along with it. Not to mention the catastrophic damage caused by the ensuing flood. That would cost hundreds of billions in damage, so $240 million isn't so bad really. Besides, it'll save quite a lot in security checkpoints that have been in place since 9/11 too. None of those things is cheap.
#3 Post by roren, on Tue Nov 10 2009 2:6 AM
so cool~
#4 Post by Evgeniy, on Tue Nov 10 2009 5:27 AM
Cool!!!
-----------
http://www.city-meeting.com/
#5 Post by EIA, on Fri Nov 13 2009 2:13 PM
That's sweet, I wonder who'll be the first to BASE jump that.....
Your Name: (* required)
Your Email: (never displayed, * required):
Your Message: